Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/15/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) REMOVE ALL TAPE FROM VENT JOINTS AT WATER HEATER AND FURNACE. MAKE UP FURNACE VENT WITH APPROVED VENT CONNECTORS. PROVIDE FASTENERS AT VENT CONNECTOR JOINTS. TERMINATE VENTS MIN IMUM 3' ABOVE TOP OF COOLER INTAKES WHEN WITHIN 10' OF COOLER INTAKE WITH DBL WALL VENT PIPING AND CAP 2) WATER HEATER TEMPERATURE AND PRESSURE RELIEF VALVE PIPING TO TO GRVITY DRAIN WITH APPROVED MATERIAL TO APPROVED LOCATION 3) PETITION OF APPEAL LEFT ON SITE 4) NOTE: VERIFY T & P VALVE IS FUNCTIONAL 5) PROVIDE ROOF MASTIC TO MAKE ROOF FLASHINGS AT PIPE PENETRATIONS WEATHER TIGHT 6) PROVIDE BONDING OF BLDG GAS PIPING |