Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) CHECK #18179 |
|
| 04/01/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 15 PSI TEST 2) PLASTIC PIPE REQUIRED 18" MINIMUM DEPTH 3) REMOVE ALL STONES FROM TRENCH AND HAVE CLEAN BACKFILL ON SITE-MUST HAVE 12" OF CLEAN FILL 4) T & P RELIEF VALVE DOES NOT WORK 5) T & P DRAIN CANNOT RUN UP HILL. NO FLEX COPPER ALLOWED IN T & P DRAIN 6) RETEST SYSTEM AFTER PIPE IS LOWERED IN TRENCH 7) PLASTIC PIPE TO BE ON A CLEAN AND FIRM BED |