Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/14/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 04/13/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CAP OLD PIPING IN BLDG 2) WATER HEATER TEMPERATURE AND PRESSURE RELIEF TO GRAVITY DRAIN 3) PROVIDE APPROVED GAS SHUT OFF VALVES AT FURNACE AND WATER HEATER 4) UNION AT EXTERIOR CANNOT BE UNDERGOUND MUST BE ACCESSIBLE ABOVE GRADE 5) SUPPORT AND SECURE PIPE RISER TO ROOF 6) VENT FROM WATER HEATER TO EDTEND 3' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF INTAKE WITH DBL WALL VENT PIPING 7) PRIME & TAP 90 UNDERGROUND AT RISER AT BLDG-MAKE CORRECTIONS AND RETEST |