Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 03/31/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 03/17/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) STORAGE TANK TO HAVE T & P GRAVITY DRAIN TO DAYLIGHT WITH APPROVED RIDGID PIPING 2) SUPPORT EXPANSION TANK, ALL PIPING, RETURN PIPE AND CONDENSATE DRAIN 3) CLEAN COMBUSTION AIR OPENINGS 4) ALL PIPING TO BE CONFIGURED TO PROVIDE CORRECT CLEARANCE FOR MAIN DISCONNECT 5) WATER FLEX TO BE FREE OF KINKS 6) ETERNAL TANK TO SIT ON APPROVED BASE 7) BOTH STORAGE TANK AND ETERNAL TO HAVE DRIP PANS 8) PROVIDE APPROVED ELECTRIC SUPPLY TO ETERNAL TANK |