Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/20/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) MAKE ALL CORRECTIONS FROM 3/29/11 2) PROPERLY SUPPORT GAS PIPING TO ROOF TOP HEATING UNIT AND SECURE BLOCKING TO ROOF |
|
| 03/29/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE GFCI PROTECTED OUTLET FOR ELECTRIC TO EXTERIOR ? WATER HEATER 2) CONDUIT TO OUTLET TO BE PROPERLY SUPPORTED WITH OUTLET BOX 3) FLASHING FOR CONDUIT TO BE WEATHER TIGHT 4) PROVIDE PROVIDE 24" CLEARNACE IN FRONT OF RINNAI PER MANUFACTURE 5) PROVIDE NIPPLED WITH NO THREADS ON DISCHARGE END OF RELIEF VALVE 6) SUPPORT GAS PIPING ON ROOF WITH WEATHER RESISTANT BLOCKING MASTIC TO ROOF AND PIPING SECURED TO BLOCKING 7) WEATHER SEAL LAGS FOR WATER HEATER SUPPORT FRAME 8) TIGHTEN ALL FASTENERS AND LAGS FOR FRAME 9) INSTALL ALL VALVES AND RETEST SYSTEM ON COMPLETION 10) ALL FLEXES TO BE ON SITE 11) VERIFY BTU OF FLEX MEETS OR EXCEEDS BTU DEMAND OF APPLIANCE |