Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/12/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) REMOVE ROCKS AND DEBRIS FROM DITCH AND BACKFILL WITH 1/2" MINUS MATERIAL |
|
| 05/10/2011 | PLUMBING - FINAL | Cancelled | CANCELED PER ALICIA OF TRIUMPH AIR #408-7444 | |
| 05/10/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CANCELED |
|
| 03/25/2011 | PLUMBING - FINAL | Denied | RESEAL ALL PIPE PENETRATIONS THRU ROOF. ALL UNDERGROUND TOOL MARKS AND FITTINGS TO BE COVERED WITH PIPE TAPE PRIMER, THEN WRAPPED WITH PIPE TAPE TO ACHIEVE A 40 MIL THICKNESS OF PIPE WRAP. CONTRACTOR TO PAY REINSPECTION FEE PRIOR TO FINAL INSPECTION UNDERGROUND PIPING TO STAY UNCOVERED UNTIL FINAL APPROVAL | |
| 03/22/2011 | PLUMBING - FINAL | Cancelled | IVRS - RI canceled | |
| 03/17/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PIPE TEST TO BE IN PLACE WITH 10 PSI TEST HOLDING FOR 15 MINUTES TO ALL APPLIANCES AND INTO HEARTH OF FIRE PLACE 2) PIPING TO BE PROPERLY BEDDED AND HAVE SEPERATION. PIPE CANNOT BE STACKED ON TOP OF EACH OTHER UNDERGROUND 3) ALL UNDERGROUND TOOL MARKS AND FITTINGS TO BE PRIMED THEN WRAPPED TO ACHEIVE 40 MIL THICKNESS 4) ROOF TOP PIPING TO BE PROPERLY SECURED AND SUPPORTED WITH WEATHER RESISTANT METHODS |