Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 03/23/2011 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection :* |
| 03/22/2011 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection :* |
| 03/14/2011 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
PROVIDE FACTORY COATED PIPE FOR UNDERGROUND TO 6" AGOVE GRADE WITHALL FITTINGS AND TOOL MARKS COVERED WITH PIPE WRAP PRIMER THEN WRAP WITH PIPE WRAP TAPE TO ACHIEVE A 40 MIL THICKNESS OF WRAP. IRON PIPE REQUIRES MINIMUM 12" OF BURIAL DEPTH WITH TEST IN PLACE HOLDING MINIMUM 10 PSI WITH NO LOSS FOR 15 MINUTES, TEST GAUGE TO BE IN 1/10 POUND INCREMENTS, PROVIDE APPROVED GAS SHUTOFF VALVES AT ALL APPLIANCES. PROVIDE COMBUSTION AIR FOR BTU DEMAND OF WATER HEATER/ FURNACE. REATTACH BONDING FOR BUILDING GAS SYSTEM. |