Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/15/2011 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 02/10/2011 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*PROVIDE APPROVED FLASHINGS AT ROOF PENETRATIONS MADE WEATHER TIGHT, ( FLASHINGS CANNOT BE ALTERED) VENT FROM WATER HEATER TO HAVE 1" MINIMUM CLEARANCE FROM COMBUSTABLE ROOF CONSTRUCTION WITH DOUBLE WALL VENT INSTALLED IN DIRECTION OF VENT FLOW WITH APP. VENT CAP, INSTALL PIECE OF PIPE WITH NO THREADS ON END INTO 90 DEGREE TERMINATION OF T&P DRAIN, REMOVE THE FUTURE TEE CONNECTION AT THE STOVE, REMOVE THE OLD GAS PIPING ON ROOF AND IN HOUSE OR CAP INTERIOR PIPING, PROVIDE BONDING OF GAS SYSTEM, SEAL PIPING ENTRY INTO BUILDING FOR STOVE, IN THE FUTURE GAS REPIPES REQUIRE CITY APP. PLAN, NOTE: (WATER HEATER UNDER KITCHEN SINK TEMPERATURE AND PRESSURE RELIEF VALVE SHOULD GRAVITY DRAIN TO DAYLIGHT TO AVOID INJURY OR DAMAGE TO STRUCTURE0 |