Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/24/2011 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 01/21/2011 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) AT WATER HEATER #1, INSTALL ALL VENT PIPE FITTINGS IN THE CORRECT DIRECTION OF FLOW, SEE PIPE ON FITTINGS ( A SHORT SINGLE WALL CONNECTION AT PIPE WATER HEATER CONNECTION WOULD HELP) GLUE ALL CPVC JOINTS. WRAP ALL TOOL MARKS BELOW GRADE. YOU NEED "FLARE" CAPS ON FLARE VALVES THAT WILL NOT BE CONNECTED. REMOVE 1 X 1/2 TEE AT METER |
|
| 01/20/2011 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 01/19/2011 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 01/13/2011 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 01/12/2011 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) 10 PSI TEST REQUIRED 2) SUPPORT AND SECURE GAS PIPING 3) SUPPORT WATER HEATER ON A SOLID LEVEL BASE 4) SECURE WATER HEATER VENT MINIMUM CLEARANCES 5) COMPLETE PIPING AT WATER HEATER AND DRYER 6) PIPE T & P TO EXTERIOR WITH APPROVED MATERIALS 7) CHECK RELIEF VALVES FOR PROPER OPERATION 8) NEW FLEXES OF PROPER SIZE REQUIRED 9) THIS ENTIRE SYSTEM HAS BEEN REPIPED WITHOUT INSPECTION AND REQUIRES A PLAN AND MANY CORRECTIONS |