Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - ENGR - Signage Final
Permit Number - T11OT01822
Inspection Description - COT - ENGR - Signage Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - ENGR - Signage Final | Not Ready | ||
05/24/2013 | COT - ENGR - Signage Final | DRoberts | Correction Required | Entered by HTHRALL1 - Clarification - re-measured pole sign, at 19' setback from face of curb off Camino Seco. Possibly in right of way, requires 30' setback for new pole sign per review staff. Revisions required to plans and or installation. |
05/15/2013 | COT - ENGR - Signage Final | Rledonne | Correction Required | Entered by HTHRALL1 - Per conversation with inspector, setback for sign east of Baskin Robbin's 11'4" tall sign is approximately 20' from face of curb. requires setback revision. Directional sign has 30' setback - revise on drawing. |
10/24/2011 | COT - ENGR - Signage Final | HTHRALL | Approved | Entered by HTHRALL1 - ALL REQUESTED REVISIONS TO THE PLANS SHOWING PLACEMENT OF THE SIGNS HAVE BEEN REVIEWED/ APPROVED BY ZONING, ENGINEERING, BUILDING CODE & SIGNS - AND INSPECTION COMPLETED. READY TO ISSUE PERMIT. |
10/20/2011 | COT - ENGR - Signage Final | DROBERTS | Approved | Entered by DROBERT5 - APPROVALABLE AT THIS TIME, ALL SITE CHANGES NEED TO BE MADE PRIOR TO FUTURE INSPECTIONS BEING APPROVED. |
10/18/2011 | COT - ENGR - Signage Final | DROBERTS | Continued | Entered by DROBERT5 - SITE REVIEW COMPLETED CLARIFICATION NEEDED PRIOR TO SITE APPROVAL. |