Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2011 | FIRE - FINAL | Approved | ||
| 04/15/2011 | FIRE - FINAL | Partial Approval | 1. water flow is being monitored. 2. fire approves for temp c of o. 3. all requirements for sprinkler system per NFPA 13 need to be in compliance before final c of o can be approved. |
|
| 04/14/2011 | FIRE - FINAL | Partial Approval | Partial approval ok to use building, still need to fix alarm system. 1. Sprinkler tampers installed 2. Duct smoke detectors repaired 3. Water flow repaired 4. Check last inspection requirements on 04/07/2011. |
|
| 04/07/2011 | FIRE - FINAL | Not ready for Inspection | 1. REPAIR TWO EXIT SIGN -NORTHWEST WALKTHROUGH AND SOUTH END AT DOC. 2. REPAIR EMERGENCY LIGHT ON COLUMN. 3. NEED TO CAP TWO DROP DOWN HEADS SOUTH WEST CORNER. 4. ADD COVERAGE UNDER ROLL UP DORRS AT DOC. 5. NEED TO PROVIDE AN INSPECTION REPORT ON SPRINKLER SYSTEM WITH NO DEFICIENCIES. 6. NEED TO SHOW CHECK VALVE HAS BEEN SERVICED. 7. PROVIDE REPORT ON ALARM SYSTEM-SHOWING LAST INSPECTION. |