Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/02/2011 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 10/14/2011 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) THIS IS A NEW INSTALLATION NOT A CHANGE OUT 2) PROVIDE ROOF LOAD CALC APPROVED BY CITY OF TUCSON 3) PROVIDE PROPER FUSE SIZE 4) ELECTRICAL CONDUIT IS TO BE BLOCKED UP OFF ROOF MINIMUM 1.5 INCHES 5) CONDENSATE NOT PROPERLY TERMINATED 6) CONDENSATE IS TO BE BLOCKED UP OFF ROOM MINIMUM 1.5 INCHES 7) ALL PVC JOINTS ARE TO BE PRIMED PRIOR TO GLUE, PRIMER IS TO BE PURPLE IN COLOR 8) ALL PVC PIPE EXPOSED TO DAYLIGHT IS TO BE COATED FOR U.V. PROTECTION 9) T-STAT WIRE NOT PROPERLY INSTALLED 10) ALL DUCT JOINTS ARE TO BE SEALED 11) PROVIDE MINIMUM R-8 INSULATION IN ROOF TOP DUCT. 2" THICK FIBER GLASS LINER, BUBBLE WRAP NOT APPROVED AS LINER |