Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/02/2011 | MECHANICAL - FINAL | Approved | ||
| 02/25/2011 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 02/23/2011 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 02/17/2011 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) REFRIDGERATION PIPING NOT INSULATED 2) ALL PIPE PENETRATIONS TO HAVE ROOF JACKS 3) PROVIDE APPROVED SERVICE OUTLET 4) CONDENSATE CANNOT TERMINATE AT WASTE VENT 5) NEUTRAL WIRE NOT TO BE USED AS A HOT LEG 6) PROVIDE BLOCKING AT GAS PIPING ON ROOF 7) FLUE PIPING NOT PROPERLY INSTALLED 8) PROVIDE SECONDARY DRAIN AT INDOOR COIL 9) ALL PVC JOINTS TO HAVE PRIMER, PRIMER IS TO BE PURPLE IN COLOR 10) PROVIDE COMBUSTION AIR AT MECHANICAL CLOSET 11) PROVIDE BARRIER BETWEEN RETURN PLENIUM AND MECHANICAL CLOSET |