Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/04/2011 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 04/07/2011 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* 1) INSULATE BOTTOM SIDE OF EXPOSED DUCT ON ROOF 2) PROVIDE THE STRUCTURAL DRAWING 3) CSST GAS LINE REQUIRED TO BE 3/4" TO FURNACE |
|
| 02/11/2011 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE A PROTECTIVE COATING ON EXPOSED ARMAFLEX 2) GAS SHUT OFF VALVE TO BE INSTALLED BEFORE THE FLEX CONNECTOR 3) PROVIDE MINIMUM R8 DUCT LINER IN ALL EXPOSED DUCT ON THE ROOF 4) PROVIDE THE REQUIRED GFI SERVICE RECEPT ON THE ROOF 5) TERMINATE CONDENSATE WITHIN 6" OF THE GROUND 6) PAINT ALL EXPOSED PVC AND FITTINGS WITH LATEX PAINT 7) BAROMETRIC DAMPER MAY BE LOCATED IMPROPERLY. IF THERE IS ONE AT THE COOLER IT WILL HAVE TO BE ACCESSIBLE. IF IT IS LOCATED UPSTREAM OF THE BRANCH DUCT, IT IS IN THE WRONG LOCATION 8) PROVIDE THE STRUCTURAL DRAWING FOR NEW A/C UNIT ON ROOF |
|
| 02/01/2011 | MECHANICAL - FINAL | Denied | IVRS - Inspection : There is no access to the site.| 920* PLEASE PROVIDE ACCESS TO THE ROOF. |