Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/23/2012 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 04/13/2012 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE LADDER FOR ROOF INSPECTION |
|
| 06/10/2011 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PLEASE SCHEDULE AN INSPECTION WHEN SOMEONE WILL BE HOME |
|
| 01/13/2011 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE THE REQUIRED ROOF TOP STRUCTURAL DRAWING FOR NEW A/C ON THE ROOF 2) PROVIDE R8 DUCT LINER IN ALL EXPOSED DUCT ON ROOF 3) TERMINATE CONDENSATE TO WITHIN 6" OF THE GROUND 4) 3/8" I.D. X 24" GAS FLEX NOT ADEQUATE FOR 100,000 BTU 5) RELOCATE DISCONNECT MOUNTED TO SERVICE PANEL 6) INSULATE PLENIUM IN ATTIC WITH R8 INSULATION 7) PROVIDE THE REQUIRED GFI SERVICE RECEPT ON ROOF |