Inspection History Details
Inspection Status: Approved
Inspection History: INSP - REINSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/06/2011 | INSP - REINSPECTION | Approved | Recived paperwork work was done. Looked in pit all done. | |
| 07/21/2011 | INSP - REINSPECTION | Correction Required | Pre-citation given 5 year check valve not done. Re-inspection set for August 23, 2011. | |
| 05/10/2011 | INSP - REINSPECTION | Correction Required | Called and talked to Ruben (907-6058) about getting the check valve inspection done he stated they just received there last bid and he is waiting for their boss to pick which company they are going to use I gave him a re-inspection date of May 23, 2011. | |
| 04/18/2011 | INSP - REINSPECTION | Correction Required | Received paperwork from Mrs. Applegate that flow switches are repaired. | |
| 03/29/2011 | INSP - REINSPECTION | Correction Required | Not ready need more time April 14, 2011 Check valve inspection needs to bided on united fire not able to do because of the OS&Y valve is located on the wrong side of the check valve and they will need to call out city water to shut down the main line, the owner will be installing another valve before the check valve but they will need to cut piping and resize the valves. |
|
| 03/07/2011 | INSP - REINSPECTION | Correction Required | Mrs. Applegate ask for more time they just gave approval to United Fire to do all repairs United Fire will have the repairs done by 03/23/2011, I set up the re-inspection for 03/28/2011. |