Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - TEMPORARY SERVICE
Permit Number - T11EL02376
Inspection Description - ELECTRIC - TEMPORARY SERVICE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/04/2012 | ELECTRIC - TEMPORARY SERVICE | Approved | ||
12/05/2011 | ELECTRIC - TEMPORARY SERVICE | Partial Approval | IVRS - Inspection :* 1) LOADS NOT CONNECTED YET-CALL FOR INSPECTION WHEN READY |
|
11/29/2011 | ELECTRIC - TEMPORARY SERVICE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE LETTER OF TORQUE FOR EQUIP. TORQUED PER MANUFACTURE SPEC BY CONTRACTOR 2) BRACE SERVICE ENTRANCE CONDUCTORS PER NOTE ON PLAN E-20 3) CONTACTOR TO OPEN ALL EQUIPMENT AS NECESSARY FOR INSPECTION OF SES EQUIP, J-BOX, FEEDERS AND PANELS INSTALLED 4) NEED BUSHINGS AT CONDUIT ENDS, PER 600.4 & 352.46 NEC 5) HOUSE KEEPING PAD TO SMALL, SES EQUIP EXTENDS APPROX 1 1/4" BEYOND PAD 110.12 NEC 6) ANCHOR CABINET PER MANUFACTURE |