Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2013 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 01/24/2013 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*CORRECTION NOT DONE AS PER LAST INSP. |
|
| 01/23/2013 | ELECTRIC - FINAL | Partial Approval | 1. ISOLATE GROUNDS & NEUTRALS AT SUB PANEL 2. OK U.G. RECALL INSPECTION WHEN DONE |
|
| 12/10/2012 | ELECTRIC - FINAL | Denied | 2 GROUND RODS REQUIRED 6' APART, DRIVE IN FLUSH WITH EARTH. NOTE #9 OF LAST INSPECTION. REFEE NEXT INSPECTION IF NO COMPLIANCE |
|
| 12/04/2012 | ELECTRIC - FINAL | Denied | 1. grounding electrode system missing 2. no insulated wbushings in the back penetration of service panel, also must be sealed 3. 6x6 gutter not grounded use approved fitting to receptacle box push in plastic not approved 4 #10 sheet metal srews not strong enough for riser support at service use 1/4 min bolts 5. insulating bushings required at sub panel at house 1 1/2" 6. ground j-box above subpanel 7. i.d circuit breakers in panel 8. i.d white conductods used at hot wires with tape 9. How does 1" conduit change to 1 1/2" conduit from store room to main house ?>? verify wire size and type (feeder no marking) saee notes # inspection 3-9-12 2-10-12 |
|
| 07/19/2012 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* GROUNDING SYSTEM MISSING VANDELIZED WIRING FROM SERVICE PANEL TO SHED, APARTMENT AND HOUSE NOT TO CODE AND MUST BE WORKED SUB PANEL AT MAIN HOUSE WEATHER DAMAGE AND IS NOT RATED FOR OUTDOOR USE MET ON SITE WITH ELECTRICAL CONTRACTOR TO DISCUSS ISSUES |
|
| 03/09/2012 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) MUST HAVE BUSHING FOR BACK PENETRATION ON SERVICE PANEL, LABEL CIRCUIT BREAKERS 2) MUST USE APPOVED CONNECTORS TO TERMINATE ROMEX INTO METAL BOXES 3) NO FEEDER RUN TO HOUSE ? 4) A REINSPECTION FEE WILL BE ASSESED NEXT INSPECTION, IF NO COMPLIANCE TO CODE 5) SEE NOTE #2 LAST INSPECTION |
|
| 02/10/2012 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) WIRING METHODS FOR LOAD CONNECTIONS NOT TO CODE, INDIVIDUAL FEEDER CONDUCTORS NEED TO BE IN APPROVED RACEWAY PER NEC 300 2) USE QUALIFIED ELECTRICIAN TO DO WORK |
|
| 08/11/2011 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) METAL ADDRESS TAG RAISED LETTERS METER BASE 2) RECALL 02090 AFTER CROSS OVER |
|
| 08/09/2011 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* |