Permit: T11EL02129

Parcel: 138070970

Inspection Status: Approved

Inspection History: ELECTRIC - FINAL

Date Description Inspector Results Comments
02/07/2013 ELECTRIC - FINAL Approved IVRS - Inspection :*
01/24/2013 ELECTRIC - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*CORRECTION NOT DONE AS PER LAST INSP.
01/23/2013 ELECTRIC - FINAL Partial Approval 1. ISOLATE GROUNDS & NEUTRALS AT SUB PANEL
2. OK U.G. RECALL INSPECTION WHEN DONE
12/10/2012 ELECTRIC - FINAL Denied 2 GROUND RODS REQUIRED 6' APART, DRIVE IN FLUSH WITH EARTH.
NOTE #9 OF LAST INSPECTION. REFEE NEXT INSPECTION IF NO COMPLIANCE
12/04/2012 ELECTRIC - FINAL Denied 1. grounding electrode system missing
2. no insulated wbushings in the back penetration of service panel, also must be sealed
3. 6x6 gutter not grounded use approved fitting to receptacle box push in plastic not approved
4 #10 sheet metal srews not strong enough for riser support at service use 1/4 min bolts
5. insulating bushings required at sub panel at house 1 1/2"
6. ground j-box above subpanel
7. i.d circuit breakers in panel
8. i.d white conductods used at hot wires with tape
9. How does 1" conduit change to 1 1/2" conduit from store room to main house ?>? verify wire size and type (feeder no marking) saee notes # inspection 3-9-12
2-10-12
07/19/2012 ELECTRIC - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
GROUNDING SYSTEM MISSING VANDELIZED
WIRING FROM SERVICE PANEL TO SHED, APARTMENT AND HOUSE NOT TO CODE AND MUST BE WORKED
SUB PANEL AT MAIN HOUSE WEATHER DAMAGE AND IS NOT RATED FOR OUTDOOR USE
MET ON SITE WITH ELECTRICAL CONTRACTOR TO DISCUSS ISSUES
03/09/2012 ELECTRIC - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) MUST HAVE BUSHING FOR BACK PENETRATION ON SERVICE PANEL, LABEL CIRCUIT BREAKERS
2) MUST USE APPOVED CONNECTORS TO TERMINATE ROMEX INTO METAL BOXES
3) NO FEEDER RUN TO HOUSE ?
4) A REINSPECTION FEE WILL BE ASSESED NEXT INSPECTION, IF NO COMPLIANCE TO CODE
5) SEE NOTE #2 LAST INSPECTION
02/10/2012 ELECTRIC - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) WIRING METHODS FOR LOAD CONNECTIONS NOT TO CODE, INDIVIDUAL FEEDER CONDUCTORS NEED TO BE IN APPROVED RACEWAY PER NEC 300
2) USE QUALIFIED ELECTRICIAN TO DO WORK
08/11/2011 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
1) METAL ADDRESS TAG RAISED LETTERS METER BASE
2) RECALL 02090 AFTER CROSS OVER
08/09/2011 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*