Case: T11DV10171

Parcel: 13819029C


Addresses:

175 W VALENCIA RD


Inspection Status: Approved

Inspection History: INSP - FOLLOW UP CODE ENFORCE

Case Number - T11DV10171

Inspection Description - INSP - FOLLOW UP CODE ENFORCE

Inspection Status - Approved

Date Description Inspector Results Comments
05/17/2012 INSP - FOLLOW UP CODE ENFORCE Approved PERMIT HAS BEEN FINALIZED ON 5-11-12 VIOLATION ABATED CLOSE CASE
04/18/2012 INSP - FOLLOW UP CODE ENFORCE Approved MET WITH MANAGEMENT AND THEY WERE NOT SURE IF THE INSPECTION HAD BEEN DONE. THEY SHOWED THE PERMIT AND NO INSPECTION SHEET WITH THE PAPER WORK. CALLED DAVE JOHNSTON AND HE CHECKED AND NO INSPECTION HAD BEEN DONE. INSPECTION WILL BE CALLED IN FOR TOMORROW. WILL CHECK IN 10 DAYS. RV.
03/16/2012 INSP - FOLLOW UP CODE ENFORCE Approved OFFICE FOLLOW UP:
PERMIT HAS BEEN ISSUED, T12OT00260 ON 2-22-12 AND NO INSPECTION HAVE BEEN DONE. THE SITE PLAN HAS BEEN APPROVED AND LACKING THE INSPECTION ON SITE. WILL CHECK IN 45 DAYS. RV.
02/14/2012 INSP - FOLLOW UP CODE ENFORCE Approved MET WITH THE MANAGEMENT AND THEY CALLED THE CONTRACTOR WHERE THE PERMIT WAS. THE CONTRACTOR CAME TO SITE TO GO OVER WHAT IS BEING DONE FOR THE PERMIT TO BE ISSUED. HE STATED THAT THE SIGN COMPANY IS DOING THE DRAWINGS AND APPLYING FOR THE PERMIT. CONTRACTOR ADAM ORTIZ HAS MET WITH LEE-RAY AND NO PERMIT FOR THE STRUCTURE IS BEING REQUIRED. THEY WILL BE GOING UNDER THE MONUMENT PERMIT AND EVERYTHING WILL BE GOING THROUGH SIGNS. WILL CHECK IN 30 DAYS. RV.
12/30/2011 INSP - FOLLOW UP CODE ENFORCE Approved DID THE N.O.V. AND MET WITH THE MANAGEMENT TO HAND DELIVER THE N.O.V. WHILE ON SITE THE CONTRACTOR CALLED AND WENT OVER THAT A PERMIT IS REQUIRED FOR THE WORK DONE ON THE ENTRANCE TOWER. WENT OVER THAT THE WOOD POST WERE EXISTING AND A FACADE WAS ADDED TO THE EXISTING POST. HE IS GOING TO MEET WITH ERNIE DUARTE TO SEE IF THE PERMIT CAN BE ISSUED. THE ASSISTANT MANAGER SIGNED ALL THE PAPER WORK AND THE CONTRACTOR WILL CHECK ON TUESDAY FOR THE PERMIT. WILL CHECK IN 30 DAYS. RV.