Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
Case Number - T11DV09907
Inspection Description - INSP - INITIAL CODE ENFORCMENT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/16/2011 | INSP - INITIAL CODE ENFORCMENT | Approved | MET WITH THE CONTRACTOR AND THE MODULAR BUILDINGS ARE BEING BUILT AND INSPECTED BY THE STATE. THERE WAS A BUILDING BEING USED AS CLASSROOMS AND WAS DAMAGED BY A WIND AND RAIN STORM. THE ELECTRICAL IS STILL OFF TO THE BUILDING AND IT CONTROLS THE STREET LIGHTS IN THE PARKING LOT. THEY CURRENTLY HAVE TELESCOPE LIGHTING ON GENERATOR LIGHTING IN THE PARKING LOT AT NIGHT FOR SECURITY WITH GUARDS ON THE PROPERTY. THE CONTRACTOR HAS JUST RECEIVED PERMISSION TO LOOK AT CONNECTING THE LIGHTS IN THE PARKING LOT TO GET OFF THE GENERATORS AND LIGHTING. THEY ARE HOPING TO BE WORKING BY THE END OF JANUARY. THE CONTRACTOR REFERRED ME TO THE JUNIOR HIGH SECTION AND TALK TO SYLVIA. I DID MEET WITH SYLVIA WHO IS IN CHARGE OF THE SCHOOL AND WILL TRY TO FINISH THE LIGHTS BY THE END OF JANUARY AND WILL CALL THE HIGHER UP FOR THE PROGRAM TO SEE IF THE PROCESS CAN BE SPED UP. THE MODULAR UNITS WERE BEING INSPECTED BY THE STATE WHILE ON SITE AND CARL FROM T.F.D. HAS BEEN ON SITE FOR THE FIRE ISSUES. SPRINKLERS ARE INSTALLED AND IN THE PROCESS OF BEING TURNED ON. WILL CHECK IN 45 DAYS. RV. |