Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date |
Description |
Inspector |
Results |
Comments |
| 12/27/2012 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
All issues have been addressed. The permit for the masonry block wall under the kitchen and dinning room has a letter that no permit has to be issued for the work done. At this time the case will be closed. Violation Abated, Close Case. RV. |
| 07/25/2012 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
See Conditions (Research) |
| 06/21/2012 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
MET WITH THE OWNER AND WORK STILL BEING DONE. THE INTERIOR WORK HAS BEEN COMPLETED AND NEEDING THE AC AND THE BASEMENT WALLS TO BE COMPLETED. WILL CHECK IN 45 DAYS. RV. |
| 04/24/2012 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
MET WITH THE INSPECTOR AND THE WORK WILL START ON SATURDAY. OWNER STILL WORKING ON THE HOUSE AND NOT LIVING IN THE HOUSE. WORK IS SUPPOSE TO FINISH AT THE END OF MAY AND HOPING TO MOVE IN BY JUNE. WILL CHECK IN 60 DAYS. RV. |
| 01/10/2012 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
THE HOUSE IS VACANT AND SECURED. DID CALL THE OWNER AND HE IS STILL WORKING ON THE HOUSE ON REPAIRS THROUGH-OUT THE HOUSE. HE HAS NOT HEARD ANYTHING FROM THE V.A.N.S. PROGRAM AND WILL TRY TO CHECK ON THE STATUS OF THE APPROVAL. WILL CHECK IN 45 DAYS. RV. |
| 12/08/2011 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
MET WITH THE OWNER AND THE REALTOR FOR THE BUYER. GAVE THE PAPER WORK I HAVE AND HOW THE CASE GOT STARTED. WENT OVER ON WHAT CAN BE DONE TO THE PROPERTY. CALLED HAROLD THAT WORKS ON THE H.O.M.E. PROJECT AND THE PROGRAM MAY BE CLOSING. AT THIS TIME HE STATED THAT THE OTHER PROGRAMS WONT START UNTIL APRIL OR MAY OF NEXT YEAR. I WILL CHECK ON THE V.A.N.S. PROGRAM TO SEE IF THIS CAN BE PART OF THE REHAB SECTION DUE TO WAS VACANT AND NOW IS BEING REHAB FOR OCCUPANCY. GAVE PHONE NUMBERS TO CALL OTHER AGENCY TO CHECK IF THEY CAN HELP. THE NEW OWNER IS DOING PAINTING ON THE OTHER AREAS THAT IS NOT PART OF THE KITCHEN OR WHERE THE HOLE EXIST. THEY HAVE NOT BEEN DOING ANY WORK TO THE KITCHEN AREA UNTIL TOLD IT WAS OK TO DO WORK IN THE AREA. I WILL BE CHECKING WITH MY ADMINISTRATOR ON GETTING ON THE V.A.N.S. PROJECT FOR ASSISTANCE FOR FILLING IN THE HOLE. WILL CALL THE OWNER TO LET HIM KNOW THE RESULTSD. WILL KEEP THE SAME FOLLOW UP DATE ON 1-9-12. RV. |
| 12/01/2011 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
WENT TO THE PROPERTY WITH A LADDER TO CHECK THE HOLE. WHILE STOPPING AT THE FRONT OF THE HOUSE FOUND VEHICLES ON THE PROPERTY. DID FIND THE NEW OWNERS AND ASKED IF THEY WERE AWARE OF THE HOLE UNDER THE KITCHEN AREA AND HE SAID YES. HE THOUGHT IT WAS BY DESIGNED AND HAD WALLS. WHEN I WAS DOWN THERE FOUND WHERE THE HOLE WAS DUG OUT AND HAS NO WALLS AND THE DIRT IS EXPOSED AND NOT PROTECTED FROM DETERIORATION AND SEE WHERE THE DIRT HAS BEEN FALLING AND IN PILES AT THE BOTTOM OF THE HOLE. TOOK PICTURES TO SEND TO P.D.S.D. TO CHECK ON WHAT RECOMMENDATION OF FILLING THE HOLE OR IF A WALL CAN BE BUILT. WILL CALL THE REALTOR TO LET HER KNOW OF THE FINDING OF THE HOLE UNDER THE KITCHEN AREA. RV. |