Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | The permit is still current and the last inspection was on 7-31-14 and lacking the building final and the framing. The permit expires on 1-27-14. Will check in 120 days. RV. | |
| 06/05/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | Office Follow Up: The permit is still current and expires on 8-1-14. Lacking the finals to close the permit. Will check in 90 days. RV. |
|
| 02/03/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | Office Follow Up: The permit is still current and expires on 8-1-14. Lacking the finals to close the permit. Will check in 120 days. |
|
| 10/28/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | The permit is still current and the last inspection was 7-25-13 and the permit expires on 1-21-14. Lacking the framing and the building final only. Will check in 90 days. RV. | |
| 07/22/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | Permit expires on 12/24/2013. Follow-up within 90 days. | |
| 06/17/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | Office Phone Call: Called the owner to let her know that the permit will expire on 6-27-13. She will be calling an inspection before that to have the footings check by than. Will check in 30 days. |
|
| 05/09/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | Office Follow Up: Talk to Claudia at P.D.S.D. and the extension was given over the phone and the new expiration date is 6-27-13. Did call the owner to let her know of the new date and to not let this expiration date pass. Will check in 30 days. |
|
| 01/23/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | Office Phone Call: Talk to the owner and she is still making the correction from the last inspection. She will call P.D.S.D. on extending the permit due to expired on 12-30-12. Will check in 30 days. |
|
| 08/28/2012 | INSP - FOLLOW UP CODE ENFORCE | Approved | Office Follow Up: Permit is still current and last inspection on 7-3-12 and still needs correction and no inspection done since last checked. Will check in 60 days. |
|
| 07/05/2012 | INSP - FOLLOW UP CODE ENFORCE | Approved | OFFICE FOLLOW UP: CHECKED PERMIT PLUS AND AN INSPECTION DONE ON 7-3-12 AND NEEDS CORRECTION TO HAVE DONE BEFORE FINALED. WILL CHECK IN 45 DAYS. RV. |
|
| 11/30/2011 | INSP - FOLLOW UP CODE ENFORCE | Approved | WENT TO SITE TO CHECK IF THE VEHICLES HAVE BEEN REMOVED FROM THE PROPERTY AND THEY HAVE BEEN REMOVED FROM THE PROPERTY. WILL KEEP THE SAME FOLLOW UP DATE OF 12-12-11. RV. |