Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
Case Number - T11DV03122
Inspection Description - INSP - INITIAL CODE ENFORCMENT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/09/2011 | INSP - INITIAL CODE ENFORCMENT | Approved | I HAVE CONDUCTED AN INSPECTION OF THE SITE YESTERDAY. I DID MEET WITH THE OWNER EMMETT O'LEARY ON SITE. HE DID STATE THAT ON 5-03-2011 HE DID HAVE AN EMPLOYEE GO DOWN TO DSD TO INQUIRE AS TO WHAT TYPE OF PERMITS ARE REQUIRED. I SEE FROM JASON GREEN, CFM SENIOR ENGINEER ASSOCIATE ENGINEERING DIVISION EMAIL A STOCKPILE PERMIT, FUP APPLICATION AND SWPPP ALONG WITH A DRAINAGE REPORT FROM A CIVIL ENGINEER TO SHOW NO ENCROACHMENT IN THE FW AND FLOOD PLAIN WILL BE REQUIRED. AFTER RECEIVING THIS INFORMATION MR. O'LEARY TOOK STEPS IN HIRING CORONADO ENGINEERING TO ASSIST HIM IN OBTAINING ALL THE NECESSARY INFORMATION TO OBTAIN THE REQUIRED PERMITS. SCHEDULE A FOLLOW UP INSPECTION WITHIN 60 DAYS. NOTICE HAS BEEN ISSUED BY DSD |