Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2011 | INSP - INITIAL CODE ENFORCMENT | Approved | EMERGENCY CALL OUT BY TFD, ON SITE INSPECTION RESULTS AS FOLLOWS: FIRE DAMAGE TO TRAILER. THERE WAS A COOLER DOWN DRAFT MOUNTED ON ROOF OF THE UNIT. THERE IS DAMAGE TO THE ROOF JACK AND THE AIR PLENUM WHICH COLLAPSED INTO THE INTERIOR OF THE HALLWAY. THE INTERIOR OF THE HALLWAY HAS WOOD MEMBERS WITH CHARRING. THE FINISH MATERIAL IN THE 3 FOOT BY 12 FOOT OF THE HALLWAY AREA WAS DESTROYED. THIS ARE HAD BARE WIRES HANGING FROM THE CEILING. THE JUNCTION BOX'S WIRING ON THE ROOF WAS DAMAGED. SOUTHWEST GAS SHUT THE GAS OFF. THERE IS A WALL FURNACE IN THE HALLWAY. THE ELECTRICAL PEDESTAL'S BREAKERS WAS SHUT OFF, ALONG WITH THE TWO LIFE LINES THAT WERE DISCONNECTED. PERMITS REQUIRED FOR REPAIRS, SCHEDULE A 60 DAY FOLLOW UP INSPECTION PHOTOS IN SIRE |