Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: T11DV01568

Parcel: 129020520

Inspection Status: Approved

Inspection History: INSP - INITIAL CODE ENFORCMENT

Case Number - T11DV01568

Inspection Description - INSP - INITIAL CODE ENFORCMENT

Inspection Status - Approved

Date Description Inspector Results Comments
03/12/2011 INSP - INITIAL CODE ENFORCMENT Approved CALLOUT FOR DAMAGE TO SUBPANEL DUE TO WATER LINE BREAK IN UNIT ABOVE. ON SITE WITH TFD AND TENANT, HALLWAY CEILING HAS BEEN SARURATED DUE TO WATER LINE BREAK IN UPSTAIRS UNIT.
SUBPANEL IN HALLWAY HAS WATER IN IT. CARPET IS SOAKED.
BUBBLING OF PAINT IN HALLWAY,KITCHEN, HALLWAY CLOSET.
TFD SHUT OFF POWER TO BOTH UNITS A3 & B3, AND WATER TO BOTH.MANAGER CALLED OUT AND EMERGENCY NUMBER CALLED BUT NO ANSWER (WERTH REALTY). MANAGERS CALLED AT 1000 AND STATED THEY WERE ON THER WAY.
MANAGER VIKKI, SHOWED UP WITH MAINTANCE MAN, TO MAKE REPAIRS. NOV SIGNED AND WORK STARTED, UNIT WILL NOT BE CONDEMNED DUE TO MANAGER HAVING PRESTEG CARPET, CLEANING, AND DRAIN MASTERS FOR THE PLUNMBING, AND MAINT.
FU ON 14 MAR 11