Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2012 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/02/2012 | PLUMBING - FINAL | Partial Approval | PROVIDE STERILIZATION TEST REPORT. BACKFLOW REPORTS OK. PROVIDE FREEZE PROTECTION AT OUTDOOR PIPING. SEAL OPEN KNOCKOUTS IN DISCONNECTS. PROVIDE A GREASE RECEPTOR AT EXHAUST FAN. PROVIDE AIR BALANCE REPORT | |
| 07/20/2012 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PROVIDE WATER SYSTEM STERILIZATION BACKFLOW CONTS FOR ALL TESTABLE ASSEMBLERS INSTALL ALL ASSEMBINGS AT PROPER HEPIT HIGH HZARD PROTECTION REQUIRES FOR HAND HOLD SPRAY AT TUB AND FOUNTAIN SECURE ALL HOSE BIB VAC BREAKERS EXT WATER PIPING REQ FREEZER PROTECTION GRAVITYY DRAIN ICE MAKER MAINTAIN MIN P=REQUIRED AIR GAPS, INSTALL TO PREVENT SPLASHING OPEN FRONT TOILET SEATS IN PUBLIC USE TRS. SEAL CO PLUGS |
|
| 07/19/2012 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |