Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/02/2012 | FIRE - FINAL | Approved | ||
| 10/18/2012 | FIRE - FINAL | Denied | Alarm system needs phone lines or radio or cell phone for monitoring, before temp is given. Need to install backup lighting in the electrical room and exit way in the loading dock area, before final C of O will be given. |
|
| 10/18/2012 | FIRE - FINAL | Partial Approval | Temp C of O okay for stocking only Need to synchronized all strobes to get finals Need sidewalks in to get finals Need address numbers posted per code to get finals |
|
| 10/16/2012 | FIRE - FINAL | Not ready for Inspection |