Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T11CM03879

Parcel: 12201002E

Inspection Status: Approved

Inspection History: FIRE - FINAL

Date Description Inspector Results Comments
02/01/2012 FIRE - FINAL Approved Suite 100 only
01/30/2012 FIRE - FINAL Not ready for Inspection Suite 100 only:
1. Suite number must be displayed on front door.
2. Sign required: 'THIS DOOR IS TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED'.
3. Replace key lock in break room with pass through door knob.
4. Reolace ceiling tile in server room.