Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/05/2012 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 03/06/2012 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) INSTALLED WITH HORIZONTAL WT VENTS 2) PROVIDE A PLAN REVISION PRIOR TO FINAL |
|
| 03/05/2012 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE TEST ON DWV 2) REMOVE ALL LARGE ROCKS |
|
| 03/02/2012 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) CANCELLED PER RICHARD |
|
| 03/01/2012 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SOIL PIPING IS NOT PER PLAN 2) INDIVIDUAL FIXTURE VENTS SHOWN 3) POINT OF VENT SHALL BE ABOVE THE CENTER LINE OF WASTE PIPE |
|
| 02/29/2012 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* |