Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - HYDRONIC PIPING
Permit Number - T11CM03707
Inspection Description - MECHANICAL - HYDRONIC PIPING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/19/2013 | MECHANICAL - HYDRONIC PIPING | Approved | IVRS - Inspection :* 570,530, AND PENTHOUSE OK | |
03/08/2013 | MECHANICAL - HYDRONIC PIPING | Partial Approval | CHECKED CHILLED WATER TO PR 24 STERILIZER OK TO INSULATE 100 PSI | |
12/10/2012 | MECHANICAL - HYDRONIC PIPING | Partial Approval | 3RD FLOOR S 70 STEAM TO STERILIZERS IN O.R. HALLWAY OK TO INSULATE | |
12/06/2012 | MECHANICAL - HYDRONIC PIPING | Partial Approval | IVRS - Inspection :* | |
11/26/2012 | MECHANICAL - HYDRONIC PIPING | Partial Approval | HOT WATER REHEAT PIPING 100 PSI HYDROSTATIC TEST ON 5TH FLOOR OK TO INSULATE. | |
11/23/2012 | MECHANICAL - HYDRONIC PIPING | Cancelled | IVRS - RI canceled | |
11/06/2012 | MECHANICAL - HYDRONIC PIPING | Partial Approval | SEVERAL VAV BOXES ON 3RD FLOOR ARE NOT ACCESSIBLE. OK TO INSULATE HYDRONIC HOT WATER PIPING ON 3RD FLOOR. | |
10/18/2012 | MECHANICAL - HYDRONIC PIPING | Partial Approval | FRIST FLOOR MECH ROOM 100 PSI TEST ON CHWS & CHWR TO PENT HOUSE ON MIAN (ONLY). | |
10/05/2012 | MECHANICAL - HYDRONIC PIPING | Partial Approval | RETURN AND SUPPLY HOT REHEAT WATER 2ND FLOOR OK TO INSULATE. CHILLED WATER 2ND FLOOR OK TO INSULATE. STEAM PIPING S70 LINE IN STERILIZER HALLWAY OK TO INSULATE 2ND FLOOR. | |
05/10/2012 | MECHANICAL - HYDRONIC PIPING | Partial Approval | IVRS - Inspection :* 1) CHECK HYDRONIC PIPING TO RELOCATED CHILLED WATER FILTER IN CENTRAL PLANT 2) 100 PSI HYDROSTATIC TEST OK 3) OK TO INSULATE |