Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - MEDICAL GAS/TEST
Permit Number - T11CM03707
Inspection Description - PLUMBING - MEDICAL GAS/TEST
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/31/2013 | PLUMBING - MEDICAL GAS/TEST | Approved | IVRS - Inspection :* | |
| 12/13/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 12/07/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | RELOCATION OF MEDICAL ZONE VALVES FOR 2ND LEVEL ORS, WITH TEST OK | |
| 11/28/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | MECH ROOM DR46 FROM SKYWAY 20137 MED GAS PIPING UP TO DR4A. TO BE TESTED AT LATER DATE. TEST FROM MED GAS BOTTLE TO SHAFT IN PENT HOUSE. | |
| 11/06/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | VAC PUMP. CYLINDER MANIROLDS, UTILITY TUNNEL | |
| 11/01/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | WORK ON L5 PENTHOUSE | |
| 10/31/2012 | PLUMBING - MEDICAL GAS/TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 10/24/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | ||
| 10/12/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | INSTALLING OR 2 WITING FOR CHANGES ON 5&7. TEST ON ALL PIPING, WAITING FOR THIRD PARTY VERIFIER. | |
| 10/11/2012 | PLUMBING - MEDICAL GAS/TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 10/09/2012 | PLUMBING - MEDICAL GAS/TEST | Cancelled | IVRS - RI canceled | |
| 10/05/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | DWV 4" LEVEL TEST 37 OK DOMESTIC WATER 4" LEVEL IN WALLS PRS JANITOR SCRUB SINKS OK | |
| 10/04/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 10/03/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | 4TH LEVEL TEST. INSTALLERS IN PENTHOUSE. | |
| 09/28/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | MAINS L4 AREA A, COL K. | |
| 09/26/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | TEST ON LEVEL 4 FROM COL WITH VERIFIER OK A-F | |
| 09/24/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | testing L2 EXCEPT FOR OR'S PENDING L3 MAINS AND ORS, THIRD PARTY VERIFIER ISNTALLING AND TESTING PR'S ON L4 | |
| 09/21/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 09/20/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | HIGH PSI TESTING, MAINS, ORS AND SHAFT FROM 2 THRU 4 INSTALLING PRS LEVEL 4 | |
| 09/18/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | 4TH LEVEL PATIENT ROOMS SOAP TESTING ORS AND MAINS THUR LEVEL 4 | |
| 09/14/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 09/12/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 09/11/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 09/10/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 09/07/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 09/05/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 09/04/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | VERIFIER FOR L3 AREA A PROGRESS ON LEVELS 3 AND 4 |
|
| 08/31/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | INSTALLERS WORKING ON ORS L 2+3 MAINS AND ROUGH IN BOXES L4 | |
| 08/29/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 08/28/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | L3 AREA A, CONFIRM 24HR TEST ON AIR + O2 | |
| 08/27/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | LEVEL 3 AREA A; 0 AND MV. PR'S AND OVERHEAD, DN STRM OF ZONE VALVES | |
| 08/23/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | DOMESTIC WATER IN WALLS; SCRUB SINKS CORR 20250, 20475, 30202 OK TRS 20389,20483, 20484 OK. ALL WATER IN WALLS CORR 30202 AND TO THE WEST. 100 PSI TO STS OK. STAFF & PHYSICIANS CHANGE 3RD LEVEL OK. |
|
| 08/22/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | ORS L 2 BLOW DOWN AND INSTALL L 3 | |
| 08/21/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | INSTALLATION ON L3 PIPING RACKED OVER HEAD L4 |
|
| 08/20/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 08/17/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | 1. Third floor patient rooms. | |
| 08/16/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | 1. Medical gas patient rooms third floor. | |
| 08/14/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | 2-PR RMS AND AREA ALARM, OVER MAINS LEVEL 2. UNDER TEST, MARK DOOSON. | |
| 08/13/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | WALKED 2ND FLOOR WITH JEFF. THEY ARE SETTING UP FOR TESTING . NO CONCERNS AT THIS TIME. | |
| 08/09/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 08/08/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | 3RD LEVEL PIPING, 4TH LEVEL SUPPORTS PACO'S SW SIDE LEVEL 2. 14 INSTALLERS AND 1 HELPER |
|
| 08/07/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | MED GAS PROGRESS BLOW DOWN AND TESTING LEVEL 2 INSTALLLATION L3, ZONE VALVE BOXES AND OUTLETS L4 |
|
| 08/06/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | PRESSURE TESTING IN WALLS, PACUS WEST OF CORRIDOR | |
| 08/03/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 08/02/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | BLOW DOWN AND SOAP TESTING ON COVER 2. MAINS AND PAWS LEVEL 3. LAYOUT AND BOXES LEVEL 4. | |
| 08/01/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 07/31/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | 2ND LEVEL OF PIPING, 3RD LEVEL MAINS AND ZONE VALVES | |
| 07/25/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 07/24/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 07/23/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 07/20/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 07/18/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 07/16/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | 1. Log OK. Storage OK. Tanks OK. North side- third floor. | |
| 07/12/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 07/10/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 07/09/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | PRESURE TESTING LEVEL 2, NORTH OF CORRIDOR 20395 JEFF, STEVE, MARK DONSON |
|
| 06/26/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* 8 INSTALLERS +1 ? 2ND LEVEL PATIENT ROO, AND BLOW DOWN W NF |
|
| 06/25/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | WALKED 2ND FLOOR WITH JEFF WITH SUN. | |
| 06/21/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* STARTING BLOW DOWN & CROSS CONN TESTING |
|
| 06/18/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 06/15/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* 13 INSTALLERS WORKING ON 1-2 PACU'S AND MAINS |
|
| 06/13/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* 13 INSTALLERS ON LEVEL 2 MEET W/JOHN FORM TME, WALKED 2ND LEVEL, NOTED PLAN CHANGES IN THE WORKS |
|
| 06/11/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* 13 INSTALLERS ON LEVEL 2 |
|
| 06/08/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* PIPING ALONG CORRIDORS 20475 SNF 20492 IN WALLS & OVER HEAD OK SUBJECT TO TEDTING AND 3RD PARTY VERIFICATION |
|
| 06/07/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* 10 INSTALLS WORKING ON LEVEL 2 |
|
| 06/04/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* NEED FHA STEAPS ON STUD WATTS AT BOXES |
|
| 05/30/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 05/25/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* 1) OR1 AND OR5 |
|
| 05/24/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 05/23/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 05/22/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* 1) USE WEST WING ADDITION PERMIT FOR ALL MED GAS PIPING OTHER THAN MAINS SHOWN ON SHELL AREA A |
|
| 05/17/2012 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* 1) PLEASE USE CORRECT ACTIVITY FOR EACH INSPECTION |