Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/30/2012 |
ENGINEERING - FINAL |
|
Approved |
|
| 10/12/2012 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
MET WITH THE CONTRACTOR AND DISCUSSED WHAT IS THER INTENTION FOR THE SITE AND WHAT BUILDINGS THEY WILL BE WANTING TO BE RELEASED AND IN WHAT ORDER. |
| 10/12/2012 |
ENGINEERING - FINAL |
|
Partial Approval |
PARTIAL RELEASE IS AVAILABLE ONCE THE CONTRACTOR HAS ENOUGH SIGNATURES FROM THE OTHER TRADES. |
| 10/11/2012 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
DROVE THROUGH THE SITE TOO SEE WHAT TYPE OF WORK IS HAPPENING. CONTACTED THE CONTRACTOR AND ARRANGED TO MEET ON SITE ON 10/12/12 TO DISCUSS WHAT WILL BE NEEDED PRIOR TO THEIR SEEKING FINAL INSPECTIONS FOR THE BUILDING C OF O. |