Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/03/2012 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 03/27/2012 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) PROVIDE ACCURATE RED LINE DRAWINGS SHOWING HOW THE PIPING IS LAID OUT AND WHERE ARE THREE INLETS TO THE G.T. ORIGINATE |
|
| 03/05/2012 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) REQUIRE FLOOR SINK IN MECHANICAL ROOM 2) OK TO COVER GREASE WASTE TO OUTSIDE 3) OK TO COVER SANITARY SEWER IN KITCHEN 4) IN RESTROOMS INCLUDE P-5 FLOOR SINK IN MECHANICAL ROOM |
|
| 03/02/2012 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) RECEIVED LETTER ALLOWING PEX 2) APPROVED P-1 SHEET ON SITE 3) NOT INSTALLED PER PLAN |
|
| 02/28/2012 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) DOES P-1 NEED TO BE STAMPED BY REVIEWER ? 2) NO INSTALLED PER PLAN 3) RED LINES INCOMPLETE AND NOT PER CODE 4) INSTALL INTERCEPTOR CALLED FOR ON THE PLAN 5) PLAN CALLS FOR TYPE "?" COPPER |