Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Prior to Final Inspectn
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 02/28/2012 |
ENGINEERING - FINAL |
|
Prior to Final Inspectn |
As-built or certification from a professional is required for the venting and wet floodproofing of the attached garage. Per the site plan the attached garage is not to be elevated to the RFE. Since the attached garage is solely used for parking and storage it is required to be vented and wet flood proofed per the FUP condition. Verification of this is required prior to final approval. |