Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/14/2011 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 12/13/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) INSTALL AAV AND SINK CLEANOUT PER PLAN-NO ACCESS ABOVE THE WALL 2) A BLAKE TEE IS NOT LISTED TO BE INSTALLED BELOW GRADE. USE A DIRECTIONAL FITTING IN THE DIRECTION OF FLOW 3) FURNCOS ARE NOT PERMITTED UNDER THE BLDG-USE APPROVED SHIELDED COUPLING |