Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 03/19/2012 |
ENGINEERING - FINAL |
|
Approved |
WENT OUT TO THE SITE AFTER DISCUSSION WITH THE ZONING AND ENGINEERING SECTIONS. A SITE PLAN WILL NOT BE REQUIRED, THEY ARE REQUIRED TO HAVE 14 PARKING SPACES ON THIS SITE, AND THE REAR PATIO AREA IS TO HAVE A PROTECTIVE BARRIER TO PREVENT VEHICULAR ACCESS. THE OWNER WILL BE PLACING PARKING BLOCKS AT THIS TIME BUT MAY CHOOSE TO REPLACE THEM WITH LARGE CONCRETE PLANTERS AT A LATER DATE. ALSO THE STRIPED PEDESTRIAN AREA ALONG THE NORTHSIDE OF THE BUILDING IS NOT REQUIRED TO HAVE A 6 INCH VERTICAL SEPERATION. ALL OF THE RESOLUTIONS HAVE BEEN DETERMINED BY STEVE SHIELDS AND LOREN MAKUS. |
| 03/16/2012 |
ENGINEERING - FINAL |
|
Denied |
DENIED, SITE WORK BEING DONE WITHOUT A SITE PLAN |