Permit: T11CM03239

Parcel: 10819019H


Addresses:

715 E WETMORE RD

Inspection Status: Approved

Inspection History: FIRE SPKLR - FINAL

Date Description Inspector Results Comments
12/30/2011 FIRE SPKLR - FINAL Approved IVRS - Inspection :*
12/28/2011 FIRE SPKLR - FINAL Not ready for Inspection
12/27/2011 FIRE SPKLR - FINAL Not ready for Inspection 1 painted sprinkler head.
12/21/2011 FIRE SPKLR - FINAL Not ready for Inspection 1. Hood #3 needs accurate floor plans of appliances under the hood.
2. Exhaust fan on roof the electrical wiring needs to be water tight.
3. Various painted heads
4. 5 year check valve test required.
5. Missing sprinkler wrench
6. Must have ten feet of seperation from back of building to sheds or a 2 hour fire wall.