Permit: T11CM03166

Parcel: 12510003G


Addresses:

3497 E BROADWAY BL

Inspection Status: Approved

Inspection History: REINFORCED MASONRY PRE-GROUT

Date Description Inspector Results Comments
03/29/2012 REINFORCED MASONRY PRE-GROUT Approved IVRS - Inspection :*
03/28/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) CMU WALL AT 24'-E/1-2.9 OK TO GROUT
03/27/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) CMU WALL AT 20' 8"; GL: E/1-2.9 OK TO GROUT
2) TRASH ENCLOSURE AT 4'-8' OK TO GROUT AND CAP
03/22/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) CMU WALL AT 24' (TOP OUT) GL: 2.9/D-E OK TO GROUT PROGRESS AREA
03/21/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) CMU WALL AT 16' 8" GL: E/1-2.9; 2.9/D-E AT 20' OK TO GROUT PROGRESS AREAS
03/16/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) CMU WALLS AT 16' GL: D.75-E/2.9; E.1/2.75-2.9 OK TO GROUT PROGRESS AREA
03/15/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) CMU WALLS; GL: E/1-3 AT 12'; 2.9/B.1-D AT 24' OK TO GROUT PROGRESS AREAS
03/13/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) CMU WALLS AT 24' TOP OUT, GL: A/1-4, 4/A-B.1; B.1/2.9-4; WALL AT 20', GL: 2.9/B.1C.75-OK TO GROUT PROGRESS AREA
03/09/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) CMU WALLS AT 20' GL: A/2-4; 4/A-B.1 OK TO GROUT PROGRESS AREA
03/08/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 2ND LIFT SOUTH SIDE, 3RD LIFT 40' EAST SIDE, ? LIFT CENTER EAST SIDE, 20' LIFT NORTH SIDE UP TO DOOR OPENING
03/05/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL: 2.9/D-E 2ND LIFT, GL: 2.9-4/B.1 4TH LIFT, B.1-A/4 4TH LIFT AND 1-4/A 4TH LIFT
03/01/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) 3RD LIFT A/1-4, A-B/1, B/1-2-9-4/B.1-D; 1ST LIFT SOUTH SIDE
02/28/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL 2ND LIFT A/1-4, A-B/1, B/1-2-9-4/B.1, 1-D OK TO GROUT
02/23/2012 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) CMU WALLS AT 48" AFFE; GL: A/1-4; 4/A-B.1; B.1/2.9-4; 2.9/B.1-D OK TO GROUT PROGRESS AREAS