Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2012 | PLUMBING - INTERMEDIATE | Approved | ||
| 08/28/2012 | PLUMBING - INTERMEDIATE | Partial Approval | PLMG PRE SLAB AT MECH-ROOM OK | |
| 08/27/2012 | PLUMBING - INTERMEDIATE | Not ready for Inspection | DWV HEAD TEST FAILED | |
| 08/10/2012 | PLUMBING - INTERMEDIATE | Partial Approval | PHASE ONE COMPLETE. OK TO OCCUPY GANG BATHROOMS WILL REOPEN REQUIRED INSPECTIONS FOR PHASE TWO. |
|
| 06/13/2012 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 06/13/2012 | PLUMBING - INTERMEDIATE | Partial Approval | 1. Horizontal cleanout extensions at lavatories should be combos. Since the horizontal distance is minimum, no correction required at this time. OK to cover walls. | |
| 06/11/2012 | PLUMBING - INTERMEDIATE | Partial Approval | 1. All of the DWV system to be subjected to a test to ten feet. So that no joint or pipe shall have been tested with less than a ten foot head. 2. Cleanouts are to extend to the surface of the wall through a wye branch fitting. 3. OK to insulate hot and return piping. |