Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2011 | PLUMBING - FINAL | Approved | CLEAN BACTERIA REPORT FROM XENCO LABS ACCEPTED | |
| 12/08/2011 | PLUMBING - FINAL | Not ready for Inspection | 1) PROVIDE CLEAN BACTERIA REPORT SHOWING RESULTS OF TESTING | |
| 12/07/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SEE NOTES FROM 10/28/11 2) PROVIDE METHOD OF STERILIZATION 3) PROVIDE CLEAN BACTERIA REPORT 4) CALL IN ALL REQUIRED INSPECTIONS 5) TEMPERING VALVES 6) CLEANOUTS |