Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2012 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 01/31/2012 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) REMOVE THE HOSE CONNECTION FROM THE #1 TEST COCK TODAY (AT THE RPPBP) 2) THE ACCEPTED METHOD OF TESTING FOR NATURAL GAS IS 10 POUND TEST FOR 15 MINUTES. THE GAUGE IS TO BE A 15 POUND GAUGE IN 1/10 POUND INREMENTATION 3) FOR ROUGH PIPING ONLY-TEST OK |