Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - PROGRESS
Permit Number - T11CM02898
Inspection Description - PLUMBING - PROGRESS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/22/2013 | PLUMBING - PROGRESS | Approved | IVRS - Inspection :* | |
07/10/2013 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
07/10/2013 | PLUMBING - PROGRESS | Not ready for Inspection | SEAL JOINTS OF PIPE INSULATION REPLACE OR INSTALL ANY MISSING SUPPORTS |
|
06/27/2013 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection :* | |
06/27/2013 | PLUMBING - PROGRESS | Partial Approval | PVC CONDENSATE LINES FOR COOLERS; SECURED ELEVATED | |
06/04/2013 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
06/04/2013 | PLUMBING - PROGRESS | Not ready for Inspection | PVC FOR THREADED FITTINGS ARE NOT TO BE CONCEALED; TRIM OUT ALL CLEAN-OUT FITTINGS IN WALLS. SEAL ALL PIPE INSULLATION. | |
05/02/2013 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
05/02/2013 | PLUMBING - PROGRESS | Not ready for Inspection | PROVIDE BACKFLOW PROTECTION FOR ROOF TOP EQUIPMENT AS REQUIRED BY UPC 603 AND 301. IF UNITS HAVE INTERNAL PROTECTION, PROVIDE THE LISTING. REF GP5 #1 AND GP6. PROVIDE TRAP SEAL PROTECTION FOR ALL FLOOR DRAINS SUBJECT TO INFREQUENT USE PER UPC 1007 AND COT AMENDMENTS. ( HOSE BIB IN TR). CITY OF TUCSON AND SW GAS REQUIRE 3' FROM GAS REGULATOR TO SPARK PRODUCING APPLIANCE, REF DETAIL. OR PROVIDE MANUFACTURES REQUIREMENTS. PROVIDE ACCESS TO ALL BACKFLOW ASSEMBLIES AS REQ PER UPC 603.3.4. DETAIL GP4 #3 SPECIFIES 72" TO SUB CRITICAL LEVEL. CODE REQUIRES MAX 60" ABOVE PERMANENT PLATFORM. |
|
03/26/2013 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
02/15/2013 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection :*SD AND RYAN W/ ROCHE. |