Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
Permit Number - T11CM02877
Inspection Description - PLUMBING - GAS PRESSURE TEST
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/06/2013 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
01/17/2013 | PLUMBING - GAS PRESSURE TEST | Partial Approval | hytdrostatic pressure test ok. ok to tile into existing hydronics | |
01/09/2013 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* PROVIDE 100 PSI HYDROSTATIC TEST ON BOILER/ CHILL WATER. AIR TEST NOT ACCEPTABLE. | |
12/11/2012 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
11/29/2012 | PLUMBING - GAS PRESSURE TEST | Partial Approval | 1) MED. PRESS MAIN PRESS TEST OK UP TO REGULATOR ISO VALUES, DOWN EAST WALL TO ISO VALVES TO MVA UNITS. 2) LOW PRESS BRANCH RUNS 1ST FOUR LINES SOUTH MOVING NORTH. OK, NEED TO TIE IN APPROX 8' BETWEEN LOW AND MED. WILL BUBBLE TEST AT LATER DATE |