Permit: T11CM02699

Parcel: 11706081A


Addresses:

290 E 8TH ST

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
10/23/2012 EXCAVATION/LAYOUT REBAR & ZON Approved
09/17/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval DRY-PACK AT COLS OK
08/29/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval
08/14/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1) TPSS EQUIPMENT PAD OK TO PLACE a) install bond jumper to rebar

2) ISOLATED COL FOOTINGS 1-5/A-C
08/07/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval
07/20/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval
07/03/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval WEST SIDE CONT & SPREAD FOOTINGS FOR C6 COLS
06/29/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval
06/22/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval J-LINE & 0 LINE CONTINUOUS AND SPREAD FOOTINGS OK.
06/19/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval spread footings for portico ok
06/14/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval F/2-7 & F-H/2-3 INCLUDES COLUMNS AND UFER & CAD-WELDS
06/12/2012 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection bottom of footing found too high...need to reset all rebar.
06/11/2012 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection NOT ENOUGH PROGRESS
06/07/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval G-H/4-7 PAD AND F7 FOOTINGS

NOTE PLAN ADDITION 23/S3.1 FOR TOP MAT OF #5 INTO PAD