Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/13/2011 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* 1) CORRECTIONS HAVE BEEN MADE |
|
| 10/12/2011 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 09/29/2011 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) DISCONNECT IS OVER FUSED 2) SECURE THE DISCONNECT 3) SEAL AROUND ELECTRIC CONDUIT 4) I.D. THE CONDENSOR WITH UNIT NUMBER 5) FAN COIL DISCONNECT OVERFUSED 6) EXTEND ARMAFLEX TO COVER ENTIRE LENGTH OF SUCTION LINE AT FAN COIL |