Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/04/2012 | ELECTRIC - FINAL | Approved | 1) H2O HEATER TPR MUST HAVE POSITIVE PITCH 2) NEED FINAL GRADE 3) PAINT ROOF ABS AND REMOVE CONDENSATE DRAINS FROM VENTS 4) GAS FLUES MUST BE 2' ABOVE ADJACENT PARAPETS |