Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESS TEST FNL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/08/2011 | PLUMBING - GAS PRESS TEST FNL | Approved | IVRS - Inspection :* | |
| 08/02/2011 | PLUMBING - GAS PRESS TEST FNL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) VENTING NOT INSTALLED CORRECTLY 2) CONDENSATE PIPING NOT INSTALLED CORRECTLY 3) CONTRACTOR TO BE ON SITE AT NEXT INSPECTION |
|
| 07/28/2011 | PLUMBING - GAS PRESS TEST FNL | Not ready for Inspection | IVRS - Inspection :* 1) FLUE INSTALLED BACKWARDS 2) REMOVE ALL TAPE AND DUCT SEALER FROM FLUE PIPE 3) ALL PVC PIPE TO HAVE PRIMERED JOINTS, PRIMER IS TO BE PURPLE IN COLOR 4) PROVIDE SECONDARY DRAIN AT EVAP ? 5) LINE SET NOT PROPERLY INSTALLED 6) CONDENSATE PUMP SAFETY NOT WIRED 7) PROVIDE RUBBER GROMMETS AT LINE SETS ENTERING COIL 8) LINE SET INSULATION TO BE COATED PER MANUFACTURERS INSTALLATION INSTRUCTIONS 9) OUTDOOR UNIT OVER FUSED 10) PROVIDE AN APPROVED WATER TIGHT ENCLOSURE FOR OUTDOOR J-BOX AND PLUG HOLE IN DISCONNECT 11) T-STAT TO BE IN CONDUIT OUTDOORS 12) UNIT NOT PROPERLY SEALED UNIT TO COIL |