Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/02/2011 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 11/01/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) RETEST REPAIR LEAK ON SEEP VERTICAL TO HORIZONTAL CHANGE OF DIRECTION UTILITY SINK |
|
| 10/31/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) HAVE TESTING IN PLACE WITH CORRECTIONS LISTED ABOVE |
|
| 10/13/2011 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE CORRECT INSTALL OF GREASE INTERCEPTOR AND FLOW CONTROL WITH ONLY THESE FIXTURES THAT PRODUCE GREASE GOING TO INTERCEPTOR 2) PROVIDE CORRECT DRAINAGE FITTINGS FOR ALL APPLICATIONS 3) PROVIDE FALL ON ALL DRAINAGE PIPING 4) PROVIDE T/K COPPER ON ALL UNDERGROUND WATER PIPING PER PLAN 5) PROVIDE ALL GAS LOAD REQUIREMENTS, AS WELL AS REVISED APPROVED PLAN FOR ADDITIONS TO APPROVED PLANS 6) HAVE 03050 & 03052 INSPECTIONS ADDED TO PERMIT AND PROVIDE ACCESS TO ALL APPIANCES THAT HAVE GAS 7) THERE IS ALOT OF NEW UNDERGROUND SANITARY AND GREASE WASTE AS WELL AS A NEW INTERCEPTOR BEING INSTALLED 8) PROVIDE INFORMATION TO R. SHERRY FOR UPGRADES TO SYSTEMS AT CITY OF TUCSON PLAN CHECK |