Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2012 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 04/04/2012 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE MINIMUM AIR BALANCE REQUIREMENTS AS FOLLOWS: A) PROVIDE OUTSIDE AIR BALANCE REPORT AS INDICATED ON DRAWINGS B) PROVIDE SUPPLY AIR AND EXHAUST AIR REPORT FOR RESTROOMS IN ORDER TO VERIFY NEGATIVE PRESSURE IS MAINTAINED 2) BATHROOM EXHAUST IS TO BE INTERLOCKED WITH AHU SUPPLY AIR OR TO RUN CONTINOUSLY DURING OCCUPIED HOURS VIA TIME CLOCK OR OTHER APPROVED MEANS 3) C.U. DISCONNECT NOT PROPERLY MADE UP 4) ALL REFRIDGERATION PIPE INSULATION ON EXTERIOR OF BLDG IS TO BE COATED FOR U.V. PROTECTION 5) ELECTRICAL TAPE NOT AN APPROVED MEANS OF STRAPPING |