Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/18/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 07/22/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) INSTALL PER YOUR OF-300 APP PLAN OR REVISE AND HAVE CITY APPROVED 2) ALL POTABLE WATER PIPING EXPOSED TO FREEZING TO BE PROPERLY INSULATED PER MANUFACTURERS INSTRUCTIONS AND PROTECTED FROM UV EXPOSURE ON ROOF 3) PROVIDE MINIMUM BUBBLE TEST ON NEW GAS PIPING 4) PROVIDE SEDIMENT TRAP AT GAS ENTRY TO WATER HEATER 5) PROVIDE APPROVED UN-ALTERED VENT SYSTEM FOR WATER HEATER, WITH CORRECT CLEARNACES FOR VENTING 5) BASE PLATES OF ENCLOSURE TO BE APPROVED WOOD FOR APPLICATION 6) PROVIDE MINIMUM 6" CLEARANCE FOR SINGLE WALL VENT AND COMBUSTIBLE MATERIAL 7) REMOVE THE OLD WATER HEATER VENT THRU ROOF FROM ELOCATION OF WATER HEATER AND REPAIR ROOF 8) PROPERLY FLASH ALL PENETRATION THRU ENCLOSURE FOR ALL PIPING AND FLASH ENCLOSURE ROOF & ALL ROOF PENETRATIONS 9) ALL PIPING TO BE PROPERLY SUPPORTED AT ALL AREAS 10) LIST NOT COMPLETE 11) CONTRACTOR TO PAY REINSPECTION FEE PRIOR TO FINAL INSPECTION |